From stacks to systems | A power model for Nigeria

Olorunfemi Obasa, MBA

First published on this site in November 2026, as the sequel to From ladder to exit, the first paper in this series. Appendix B records which figures were checked against a source and which were assumptions.

In plain words

If Nigeria's grid does not recover, what should be built? The paper proposes four layers: households and shops, estates and feeders, state utilities, and a smaller national backbone. Solar and storage at the load costs about a fifth to a quarter of what a household pays for the grid with a petrol generator behind it. Adding 600 kilowatt hours a person would cost about $52 billion of capital, about $12 billion a year, which is the scale of what Nigerians are reported to spend on generator fuel. The hard part is the distribution companies' revenue when their best customers leave, and the paper sets out the rules and a three year sequence.

Published
20 November 2026
Reading time
21 min
Data
8 charts

Abstract

The first paper in this series found that Nigerian households do not climb away from a failing grid. They stack generators, batteries and solar on top of it, and for those who can afford it the rational end of that stack is to leave the grid altogether. That paper described the problem. This one proposes a model for the solution, and it starts from a plain assumption: the national grid will not be fixed in time to matter to most households, so a workable power system has to be built from the layer that already works, which is solar and storage close to the load. The model has four layers: households and small firms, estates and feeders, state utilities, and a national backbone that keeps the jobs only a grid can do. At November 2026 prices a kilowatt hour costs about ₦319 from a household solar and battery system, about ₦229 from a shared estate or feeder system and about ₦213 from a utility scale plant, against ₦1,381 for the grid with a petrol generator behind it at the 8 hours of supply surveys report. Delivering 600 kilowatt hours a person a year, more than three times today's grid output per person, would take about 86 gigawatts of solar, 176 gigawatt hours of storage and $52 billion of capital, or $228 a person. The annual cost of that build, about $12 billion, is of the same order as published estimates of what Nigerians already spend on generator fuel, which range from $3.8 billion to $14 billion. The hard part is not the technology or the money. It is the grid's finances, because the customers best placed to leave are the ones who pay the most. The paper sets out the rules that would keep that exit orderly, a sequence for the next three years, and the measures that would show the model is wrong.

1. Where the first paper left off

"From ladder to exit" reached four conclusions that this paper takes as given. Households use several sources of power at once, so the popular picture of a ladder is really a pile. A small petrol generator costs about five to eleven times the Band A grid tariff in fuel alone, while solar and a battery cost less than the generator in every case tested. Once a household owns solar and a battery, the grid is the dearer source for anything that system can supply. And those who can find about ₦3 million, or finance it, are the only ones who can make the move. The history of the grid itself is in a companion piece, Why Nigeria Has No Power.

The evidence since has not moved in the grid's favour. On Friday 20 November 2026 the Peoples Gazette reported, from the Nigeria Grid website, that the 11 distribution companies had been allocated 948 MW between them, from 133 MW for Ikeja to 28 MW for Kaduna. That is an allocation read at one time of day, not total generation, and the report's headline calls it generation of 900 MW. Taken at face value it is about 4 watts a person. The grid's own record is no better: 206 collapses between 2010 and October 2019 on System Operator records, and 12 in 2024 on press counts.

This paper does not argue for or against fixing the grid. It asks a narrower question: if the grid stays as it is, what should be built, by whom, financed how, and in what order?

2. The facts a design has to respect

A model that ignores the constraints is a wish. The facts below come from the sources named, and Appendix B says which were checked against a source and which were not.

ConstraintFigureSource
Grid output41.5 TWh generated in 2025, about 175 kWh a personEmber and Energy Institute, via Our World in Data
Grid capacity that reaches the gridAbout a third of installed capacity; plants ran at 36% of installed capacity in January 2026NERC Q3 2023 via SEforALL; NERC data via Nairametrics
Gas for powerAbout 692 million standard cubic feet a day in February 2026, under 43% of the requirementReported by Nairametrics
Debt in the gas to power chainAbout ₦6.8 trillion owed by generation companies, reported; ₦3.3 trillion owed to gas suppliers, reportedNairametrics, Legit.ng
Private generator capacityAbout 42 GW in small generators, against about 4.2 GW average available on the gridDalberg and Access to Energy Institute 2019, cited by SEforALL 2024
Households with electricity55.2% in 2024; poorest fifth 1.7%DHS 2024
Cost of moneyMonetary policy rate cut to 23% in September 2026; prime lending 19.3% and maximum lending 35.2% in March 2026CBN statements and Nigerian press
Who may regulate15 to 16 states have taken over electricity regulation under the Electricity Act 2023ThisDay, April 2026
Mini grid rulesNERC Mini Grid Regulations 2026 (10 April 2026): isolated mini grids up to 5 MW, interconnected up to 10 MWNERC, as reported
Interconnection termsNERC guidelines (December 2025) set a monthly rental fee for using the distribution network and a cost of energy fee for interconnected mini gridsNERC
Programme financeDARES, funded by the World Bank, had 391 projects under grant agreements by early 2026Press reports
Solar supplyNigeria imported 1,721 MW of panels in the 12 months to June 2025, second in AfricaEmber

Two things follow. First, the money is scarce and expensive, so a design that needs cheap long term naira capital will not get built. Second, the legal pieces for a distributed system already exist: state regulators, rules for mini grids up to 10 MW that can connect to a distribution company's network, and a published way to price that connection. What is missing is the money, the contracts and the will.

3. Five design rules

  1. Build at the load. The first mile of a power system, where a kilowatt hour is produced and used in the same place, is the cheapest and the fastest to build, and it needs no new transmission. Section 4 puts numbers on this.
  2. Assume the grid does not recover. Every cost in this paper uses the grid as measured. If it improves, the model gets cheaper to run, not wrong.
  3. Use private money, and show it where it already is. Nigerians spend billions of dollars a year on generator fuel. A design that redirects part of that spending into capital needs less new money than one that asks for it.
  4. Keep the grid for what only a grid can do. Large industrial loads, balancing between regions and sharing the cheapest power need wires, so the backbone stays, with a smaller job.
  5. Protect the households that cannot leave. A system that serves the rich and strands the poor on a failing network has failed, whatever its average cost.

4. The model: four layers

The model

Build from the load up: four layers, each with its own owner, rules and cost

  1. National backboneIndustry, balancing between states, the shared marketBuilt by Transmission company and System OperatorRules NERC; gas payment chain ring fenced
    Smaller job: wires and market, not every household
  2. State utilitiesA state's own load, with gas peakers for the eveningBuilt by State markets tender solar and storageRules State regulators under the Electricity Act 2023
    ₦213a kWh. At the plant fence, before delivery
  3. Estates and feedersHundreds to thousands of customers, up to 10 MWBuilt by Private operators, feeders franchised by distribution companiesRules Mini Grid Regulations 2026; interconnection guidelines (rental fee, cost of energy)
    ₦229a kWh. Assumed component prices
  4. Households and shopsOne home or businessBuilt by The owner, on lease or pay as you go financeRules Equipment standards; fixed access charge with net billing
    ₦319a kWh. Retail prices, 20% cost of capital
₦1381a kWh today: the grid for 8 hours with a petrol generator behind it
Cost of one kilowatt hour at November 2026 prices from the model in this paper. The estate and utility figures rest on assumed component prices and costs of capital (Appendix A).

Layer one is the household or the shop. A financed solar and battery system of the kind priced in the first paper, about ₦3 million for a 5 kVA unit with 5 kWh of storage. It is the fastest layer because it needs no permission from anyone, and it is already happening: Ember's customs data show 1.7 GW of panels imported in a year. Its limits are cost and scale. The model's central figure is ₦319 a kilowatt hour at a 20% cost of capital, and it puts a ₦3 million bill in front of households that earn a few tens of thousands a month.

Layer two is the estate or the feeder. One shared plant, from a few hundred kilowatts to 10 MW, serves a group of customers over its own wires or over a distribution company's feeder. It is cheaper than the household layer for three reasons: bigger equipment costs less per unit, loads in a group do not all peak together so less storage is needed, and the financing is commercial instead of household credit. It is also the layer the 2025 and 2026 rules were written for. The December 2025 interconnection guidelines set the commercial terms for a mini grid that connects to a distribution company's network, a monthly rental fee for using the network and a cost of energy charge for any grid energy it takes, and the 2026 regulations allow interconnected plants up to 10 MW. This paper estimates its cost at about ₦229 a kilowatt hour. The inputs for that figure are assumptions (Appendix A), and the layer's own track record in Nigeria is short: reports talk of the national count passing 1,000 mini grids only in 2026.

Layer three is the state. State electricity markets can tender for solar and storage plants of tens of megawatts, matched to a state's own load, with gas fired peaking plants for the evenings that storage cannot cover. At that scale and a dollar linked cost of capital the model gives about ₦213 a kilowatt hour at the plant fence, before the cost of the network that delivers it. This is the layer that needs contracts that lenders trust, which in Nigeria means payment security.

Layer four is the national backbone. The transmission company and the System Operator keep the high voltage network, the large hydro and gas plants that run for industry, and the interconnections that let a state with surplus sell to one that is short. Its job shrinks from serving every household to being the market place and the safety net. Its main problem today is the gas to power chain: a reported ₦6.8 trillion of debt and gas supply under 43% of the requirement.

Solar and storage at the load costs ₦213 to ₦319 a kilowatt hour, against ₦1,381 for the grid with a petrol generator behind it

Hover, focus or click a bar for its detail. Click to pin it and compare the others against it.

Unit: ₦ per kWh. The estate and utility figures rest on assumed component prices and costs of capital (Appendix A). The utility figure is at the plant fence, before the cost of delivery. The grid tariff applies when there is supply; surveys report 6.6 to 8 hours a day.

Source: Extrafemi Research model and "From ladder to exit", inputs in Appendix A; World Bank ESMAP, Mini Grids for Half a Billion People (2022), converted at ₦1,354 to the dollar

The chart puts the layers beside today's alternatives. Two points matter. The three solar and storage layers all cost less than the petrol generator that most households use for the hours the grid is off, by a factor of about five to seven, and the two shared layers cost about the same as the Band A grid tariff, but with the supply the tariff promises and does not deliver. Second, published mini grid costs are higher than the model's estate figure: the World Bank's mini grid handbook puts best in class solar hybrid systems at $0.38 a kilowatt hour in 2021, with $0.30 projected for 2025 and $0.20 by 2030. Those figures are for rural systems with low and uneven loads. An estate with air conditioners and shops has a much better load profile, and that is the whole case for choosing estates and feeders first.

5. What it would take

The model sizes the build for three levels of service, each as a number of kilowatt hours a person a year, using the estate layer's costs and counting only what is added to today's measured grid output. The three levels are about Ghana's current figure, double that, and the Modern Energy Minimum threshold of 1,000 kilowatt hours that energy access researchers use.

Service levelAdded energy (TWh a year)Solar (GW peak)Storage (GWh)Capital ($ billion)Capital per person ($)Annual cost ($ billion)
300 kWh a person27.524.650.215.0653.4
600 kWh a person96.586.4176.252.522812.1
1,000 kWh a person188.5168.7344.2102.544623.6

The figures assume all new energy comes from solar with storage, that 60% of it passes through a battery, a 17% cost of capital for the equipment and 25 and 8 year lives for panels and batteries. They exclude the cost of the wires that connect the plants to customers, and a real build would be a mix with some gas and hydro. They are therefore a scale, not a budget. The middle row, $228 a person, is close to the World Bank's own estimate for mini grids worldwide, 217,000 systems for 490 million people at a cost of $127 billion, which is about $260 a person. That agreement is a sanity check on the arithmetic, not independent proof.

The yearly cost of adding 600 kWh a person with solar and storage, about $12 billion, is of the same order as what Nigerians are reported to spend on generator fuel

Hover, focus or click a bar for its detail. Click to pin it and compare the others against it.

Unit: US$ billion a year. The spending estimates are for different years and definitions, and the $14 billion figure has no primary source I could find. The model's annual cost is the cost of equipment finance and replacement; it does not count the wires.

Source: Extrafemi Research model, inputs in Appendix A; PeopleSuN survey paper (2023); SEforALL and Lagos State Government (2024); Bloomberg (2019), via The Cable; credited variously to the AfDB, IMF, CBN or Stears

The comparison is the heart of the argument. Households and businesses already pay for electricity they do not get from the grid, and the published estimates of that spending are large. Part of it is fuel for equipment that will be replaced anyway. If a fair share were redirected, through lease finance for batteries and panels or through estate level contracts, the first two service levels would need little money that is not already being spent. The third would not. It would need an annual outlay above even the highest spending estimate, and it would depend on the economy growing.

The federal subsidy is the other pool. The Federal Government's electricity subsidy ran at ₦1.98 trillion in the twelve months to September 2025, about $1.5 billion. The desk's earlier essay, Solar Inverters, argues that consumers already pay the government's bills as well as their own. The subsidy currently narrows the gap between the cost of energy and the tariff for everyone connected. It could instead pay for part of the first loss on estate and state contracts, which is the piece that makes them bankable.

6. The hard part: the grid's finances

Everything above is the easy half. The hard half is what happens to the distribution companies when their best customers leave, and the evidence from Pakistan is a warning.

Ember reports that Pakistan's distributed solar grew from 15 terawatt hours in the 2023 financial year to 51 in 2025, covering all of the country's demand growth while grid generation fell 3%. Ember's analysts warn that falling grid demand can push tariffs up, because fixed costs are spread over fewer buyers. A February 2026 note by the credit rating agency Agusto & Co sets out the Nigerian version of the risk: the customers most able to buy solar pay the highest tariffs, so their exit takes the largest share of revenue from the distribution companies and leaves the households least able to leave on a network with rising prices. It calls the result an "energy apartheid". The note's figures are mostly unsourced, and some do not reconcile, so this paper uses it for the argument and not for the numbers.

The arithmetic of the problem is simple. If a share of the kilowatt hours sold leaves, and a share of the network's costs is fixed and must still be recovered, then the price for those who remain rises by the fixed share times the exit share divided by what remains.

02040608010001020304050

Hover, touch or use the arrow keys on the chart to read every line at a point. Click a name above to hide or show it.

Unit: % rise in the price for remaining customers. The fixed cost shares are assumptions: no source found measures them for Nigerian distribution companies. The rise assumes the regulator lets the company recover its costs from those who stay, which is what a cost reflective tariff does and what the 2025 reforms moved toward; if it cannot, the loss falls on the company and then on the federal budget.

With three quarters of costs fixed in the wires and capacity payments, which is an illustration and not a measured figure, a 20% exit raises the price for everyone who stays by about 19%, and a 40% exit by 50%. That is the death spiral in one line: each round of exit raises the price that drives the next. The way out is a set of rules that makes leaving the grid cheap to do and not costly to the others.

A fixed access charge with net billing. Customers who produce their own power should pay a fair share of the fixed cost of the wires they still use, through a standing charge, and be paid for any surplus they send in at a price that reflects its value. This is the opposite of generous net metering, which Pakistan is now revising. I did not find whether Nigerian distribution companies charge a standing fee on prepaid meters, and that is the first fact to establish.

Feeder franchising. Instead of fighting the exit, the distribution company can sub franchise a feeder to a private operator who builds solar and storage on it, keeps the customer relationship, and pays a rental fee for the wires and a cost of energy fee for any grid energy it uses. The December 2025 interconnection guidelines already describe those two payments. The 2023 Act's state markets let a state do the same across a whole region.

Targeted help for those who cannot leave. The subsidy is better spent on the households at the bottom of the DHS wealth scale, where 1.7% of the poorest fifth had electricity of any kind in 2024, than on the tariff band that is easiest to cross. Lifeline tariffs, connection grants and pay as you go kits for the poorest are cheaper per household than the system that excluded them.

7. A sequence for the next three years

WhenFederal and the regulatorStatesDistribution companiesDevelopers and lenders
First 12 monthsPublish feeder level supply hours and connection cancellations. Clarify duty and VAT on solar equipment and batteries. Settle the standing charge and net billing rules.Set up regulators that can license mini grids and approve feeder franchises. Tender the first state solar and storage plants.Offer the first 100 feeders for sub franchise, starting with the highest tariff ones where exit is already happening.Finance pay as you go batteries and estate plants against feeder contracts.
Years 1 to 3Move part of the subsidy into a first loss fund for estate and state contracts. Ring fence payments in the gas chain.Procure solar and storage plus peaking plants through competitive tenders with payment security.Complete franchises on the feeders where service is worst.Scale estate plants to 1,000 or more; raise the first local currency green bonds.
Years 3 to 10Make the backbone a market place: interconnect states, publish prices, retire plants that cannot run.Merge neighbouring state markets where it lowers cost.Become network operators and customer service companies.Replace the first batteries on schedule; recycle.

The indicators that matter are few and public. Hours of supply at feeder level, kilowatt hours a person, the number of interconnected plants and the customers they serve, the cost per kilowatt hour on each contract, the number of connections cancelled, and the share of poor households with any electricity.

8. What would show the model is wrong

A model should say how it can fail.

  • Battery costs stop falling or the naira keeps weakening. The household and estate layers depend on equipment priced in dollars and financed in naira. A further large fall in the naira, or a rise in battery prices, would raise every solar figure here, and would raise the generator's cost too.
  • The exit is slower than expected. If few households can finance a system, the death spiral may never start, and the grid problem becomes a poverty problem, which needs a different answer.
  • Estate plants do not get paid. Estate and state contracts need customers who pay and a distribution company that honours its rental and energy fees. The Agusto note reports a collection efficiency of 75.1% in a recent quarter, so the risk is real.
  • Safety and waste. Batteries that are badly made, installed or disposed of are a fire and pollution risk. Standards, inspection and recycling are conditions of the model, not extras.
  • Evidence of large scale theft or fraud on mini grids, which a monitoring system should reveal early.

9. Limitations

  • The estate and utility cost figures rest on assumed component prices and costs of capital (Appendix A). They are anchored on published figures but not on Nigerian contracts, of which there are few.
  • The sizing counts only additions to measured grid output. Private generators produce energy that no one measures, so true consumption is higher than 175 kilowatt hours a person, and the added energy needed is lower.
  • The sizing leaves out wires, land and permitting, which are a large share of mini grid cost in practice, and the backbone's own needs.
  • The death spiral arithmetic uses an illustrative fixed cost share, since no source I found measures it for Nigerian distribution companies.
  • Several 2026 figures come from press reports of regulators' and operators' statements, and I did not read the underlying documents.

10. Conclusion

The first paper asked where the ladder ends and found that it ends in leaving the grid. This one asks what should be built so that leaving is not the only choice and does not leave anyone behind. The answer is a system of four layers that starts at the load, uses money Nigerians already spend, relies on legal tools that already exist, and gives the national grid a smaller and more achievable job. It costs, in the middle case, about $228 a person in capital and about $12 billion a year, which is the scale of existing generator spending. Its weak point is not engineering. It is the distribution companies' revenue, and the rules in Section 6 are what keep a fast exit from becoming a collapse. The next step is data and contracts: publish the feeder level record, franchise the first hundred feeders, and tender the first state plants, then check whether the numbers in this paper hold.


Appendix A. Inputs and sources

InputValueSource
Exchange rate₦1,354 to the US dollarOfficial market, mid November 2026, via Nigerian press reports of CBN data
PopulationAbout 230 millionUN World Population Prospects 2024 (227.9 million in 2023)
Grid generation41.54 TWh in 2025Ember and Energy Institute via Our World in Data
Solar yield1,460 kWh per kW of panels a year, then 85% round trip efficiency and 90% availabilityCentral assumption; range of 3.2 to 4.8 kWh per kW a day reported for Nigeria
Household systemRetail prices: panels ₦140,000 for 550 W, battery ₦1.7 million for 5 kWh, inverter ₦600,000 for 5 kVA, installation ₦160,000; 20% cost of capital2026 retail listings, as in "From ladder to exit"
Estate systemPanels $0.18 a watt, battery $160 a kWh, inverter $60 a kVA, plus 20% for balance of plant and installation; 17% cost of capitalAssumptions anchored on BNEF and SAPVIA (utility battery capital cost outside China about $125 a kWh in late 2025) and Nigerian panel listings
Utility systemPanels $0.45 a watt, battery $140 a kWh, inverter $45 a kVA, plus 15%; 12% cost of capitalAssumptions anchored on the same sources
Battery life8 years (about 3,000 cycles); panels 25 years; inverters 10Manufacturer specification as in the first paper
Night share through batteries60% of added energyAssumption
Mini grid cost benchmark$0.38 a kWh best in class in 2021, $0.30 projected for 2025, $0.20 for 2030ESMAP, Mini Grids for Half a Billion People (2022)
Mini grid build benchmark217,000 systems for 490 million people at $127 billionESMAP, as reported
Subsidy₦1,981 billion in the twelve months to September 2025NERC, via BusinessDay
Generator spending estimates$3.76 billion, $10 billion, $12 billion, $14 billion a yearSee "From ladder to exit"
Band A tariff₦209.5 a kWhLeadership; conflicting ₦206.80 report not resolved
Grid plus generator at 8 hours₦1,381 a kWh"From ladder to exit", central scenario
Pakistan distributed solar15 TWh (FY2023) to 51 TWh (FY2025); grid generation down 3%Ember, The solarisation of Pakistan's energy economy

Appendix B. Verification status

Checked against a source I read in full: the Peoples Gazette report of 20 November 2026 (read by a research assistant agent); the Agusto & Co note of 17 February 2026 (read by an agent, and its figures are its own and unsourced); the NERC December 2025 interconnected mini grid commercial framework (read in part); the ESMAP and IRENA, BNEF and SAPVIA figures as reported by search summaries.

Reported by a news source and not checked against the original: the gas supply figure of 692 million standard cubic feet a day and the 43% requirement; the ₦6.8 trillion and ₦3.3 trillion debt figures; plant availability of 36% in January 2026; the cut in the monetary policy rate to 23% in September 2026; prime and maximum lending rates; the 15 to 16 states with regulators; the Mini Grid Regulations 2026 caps; the DARES count of 391 projects; the 1,000 mini grid mark; the Pakistan figures from Ember.

Assumptions, not measurements: all estate and utility component prices, the costs of capital, the 60% night share of energy, and the 75% fixed cost share in the death spiral illustration.

Not established: whether distribution companies charge a standing fee on prepaid meters; the current import duty on solar panels and batteries (the Centre for the Promotion of Private Enterprise asked in April 2026 for a cut to 5% and a VAT waiver, while the IEA records a 2024 VAT order exempting solar components, and the two do not obviously agree); how many mini grids operate in Nigeria today.

References

Pelz, S., Chinichian, N., Jutte, C. and Blechinger, P. (2023). Electricity supply quality and use among rural and peri urban households and small firms in Nigeria. Scientific Data.

Sustainable Energy for All and Lagos State Government (2024). Beyond Gensets.

World Bank ESMAP (2022). Mini Grids for Half a Billion People: Market Outlook and Handbook for Decision Makers.

Ember (2025). The solarisation of Pakistan's energy economy; Africa's solar imports surge 60%.

Agusto & Co (17 February 2026). The Great Grid Exit: Market Forces, Fiscal Fragility and the Pakistani Precedent.

Nigerian Electricity Regulatory Commission (December 2025). Guidelines on Commercial Framework for Interconnected Mini Grids.

Peoples Gazette (20 November 2026). Power generation for 220 million Nigerians drops to 900 megawatts.

Obasa, O. (2026). From ladder to exit: Nigerian households, generators, solar and the grid. Extrafemi Research.

Obasa, O. (2026). Solar Inverters: A Real Solution or Just Another Nigerian Adaptation? Extrafemi Research.

Cite this

Obasa, O. (2026). From stacks to systems | A power model for Nigeria. Extrafemi Research. https://research.extrafemi.com/read/power-model